oil wildcat

Results 1 - 10 of about 22 news for the search terms: oil wildcat.

Contango Announces Successful Well Test at Eloise #1 and Updates Operations

September 12th, 2008

…  Oil & Gas Company announced today that its production test at Eloise #1 has …  the rig to Eugene Island 56 and drill the first of two wildcat exploration prospects on that block.” Kenneth R. Peak, …  is a Houston-based, independent natural gas and oil company. The Company’s core business is to explore, develop, produce and …

Canadian Superior Kicks Off Its “Oasis” Project by Signing Oil & Gas Exploration and Production Agreements for Large Oil and Gas Concession, Offshore Tunisia and Libya

September 3rd, 2008

…  Production, and Petroleum Services Company (”Joint Oil“) also signed a “Swap Agreement” awarding an overriding royalty interest and optional participating interest to Joint Oil, in Canadian Superior’s “Mariner” Block, offshore, Nova Scotia, Canada. …  within the next 6 months. The initial exploration wildcat well will be drilled on a geologically-related seismic prospect …

Majestic Oil & Gas, Inc on Wildcat Oil Well and Natural Gas Wells in Northern Montana

July 26th, 2008

…  OIL & GAS, INC a United States Public Company whose securities are …  to connect this well to the gathering system. Majestic Oil & Gas, Inc owns a 25% working interest in this well and will release …  completed and placed on production. Source: Majestic Oil & Gas, …

Majestic Oil & Gas, Inc on One Wildcat Oil Well & Two Natural Gas Wells drilling

July 25th, 2008

…  OIL & GAS, INC a United States Public Company whose securities are …  to connect this well to the gathering system. Majestic Oil & Gas, Inc owns a 25% working interest in this well and will release …  is completed and placed on production. Source: Majestic Oil & Gas, …

Oromin Announces Prospective Oil Resources at Its Santa Rosa Prospect in Argentina

July 9th, 2008

…  concludes that the unrisked probabilistic recoverable oil resource potential for the Santa Rosa project ranges from 45,167,000 barrels of oil to 380,800,000 barrels of oil, and sets out 131,564,000 barrels of oil as …  The Company emphasizes that the Santa Rosa project is a wildcat prospect, and the top of the dome structure target has not been …

Tri-Valley Surpasses Year End Oil Production Rate Goals Six Months Ahead of Plan

June 28th, 2008

…  Corporation has exceeded 2,000 barrels of oil equivalent per day (BOED) rate with total field production recorded at …  of operations for the operating subsidiary, Tri-Valley Oil & Gas Co. The most recent production test was made to measure facilities …  which includes such words and phrases as exploratory, wildcat, prospect, speculates, unproved, prospective, very large, expect, …

Tri-Valley Forms Well Services Alliance and Sells Its Production Services Equipment

June 24th, 2008

…  main opportunity which is the continued rapid build up of oil and gas production, revenue, reportable reserves, share value and reward …  which includes such words and phrases as exploratory, wildcat, prospect, speculates, unproved, prospective, very large, expect, …

Royalite Petroleum Company Inc. Plans to Drill Initial Utah Exploration Well

March 8th, 2007

…  State 16-1 well is permitted to drill an 8,500 ft. wildcat well to test the Jurassic Navajo and Permian Kaibab formations. The …  Iodine geochemical signatures have been indicators of oil and gas in various producing oil and gas fields. Royalite has a 100% …

Century Petroleum - Operations Update

January 18th, 2007

…  pending weather conditions in the area. This significant wildcat well has multiple geologic objectives with a proposed TD of 18,000 …  Petroleum Corporation is a publicly traded, dynamic junior oil and gas exploration company currently focused on making significant …

Double Eagle Petroleum Reports Christmas Meadows Update

January 18th, 2007

…  Table Top Unit #1 well. The Cow Hollow Unit #1 well had oil shows in the second Frontier sandstones and is the closest well that …  working interest would increase to 30.30%. The 16,000 foot wildcat is scheduled to reach total depth by mid-February 2007. It was spudded …