Tasman drilling update from Norra Karr REE project, Sweden

February 24, 2010 Filed Under: Rare Earth Elements  
Tasman drilling update from Norra Karr REE project, Sweden

Tasman Metals Ltd. Mr Mark Saxon, President and CEO, provides an update on developments regarding the Company’s 100% owned Norra Karr Rare Earth Element (REE) project. The drill program currently underway is nearing its conclusion with approximately 80 per cent of the program completed. In addition, a collaborative research project has been initiated, under the guidance of renowned REE expert... 

White Mountain Test Work Succeeds in Recovery of Feldspar From Rutile Flotation Tailings

January 21, 2010 Filed Under: Mining Services  
White Mountain Test Work Succeeds in Recovery of Feldspar From Rutile Flotation Tailings

White Mountain Titanium Corporation reports that it has successfully completed flotation test work to recover feldspar from natural rutile (titanium dioxide) flotation tailings. The test work program was carried out at SGS Lakefield (“SGS”) in Ontario, Canada. The aim of the program was to produce a low iron, feldspar concentrate from waste stream tailings acceptable for possible use... 

Silver Quest Resources Ltd.: Exploration Update on the Yukon Projects

September 16, 2009 Filed Under: Precious Metal  
Silver Quest Resources Ltd.: Exploration Update on the Yukon Projects

Silver Quest Resources Ltd. announce the commencement of a surface exploration program to further evaluate its properties in the White Gold area of the Yukon. The programs will comprise geological mapping, prospecting and auger sampling of previously defined geochemical anomalies on the Boulevard Property (see Press Release July 23, 2009), and prospecting and soil geochemistry on the Sizzler, VO, CC,... 

Largo Continues to Report Encouraging Results From Northern Dancer Tungsten Project, Yukon

November 10, 2008 Filed Under: Molybdenum Mining, Vanadium Mining  

Largo Resources Ltd. announced that it has received additional results for ten (10) additional drill holes that are part of the recently completed drill program of 38 holes totalling 11,500 metres at the Company’s Northern Dancer Tungsten-Molybdenum property in the Yukon. These down-dip and in-fill holes continue to upgrade and expand the limits of the higher-grade tungsten and molybdenum zones... 

Largo Continues to Report Encouraging Results From Northern Dancer Project, Yukon

Largo Resources Ltd. announce that it has received additional results for nine (9) drill holes as part of the recently completed 2008 program of 38 holes totalling 11,500 metres at the Company’s Northern Dancer Tungsten-Molybdenum property in the Yukon. These down-dip and in-fill holes continue to upgrade and expand the limits of the higher-grade tungsten and molybdenum zones outlined during... 

Largo to Defer Scoping Study for Northern Dancer Due to Encouraging Results From 2008 Drill Program

September 29, 2008 Filed Under: Molybdenum Mining, Platinum Group Metals, Vanadium Mining  

Largo Resources Ltd. announces that based on the significant results from the first 13 drill holes reported on September 4th and September 24th 2008, management has decided to wait for the results of the remaining 25 drill holes and prepare an updated mineral resource, which will serve as the basis for the preliminary economic assessment for Northern Dancer. The 2008 drill program was designed to provide... 

Drilling Begins at Fire Project, James Bay Lowlands, Ontario

September 10, 2008 Filed Under: Copper Mining, Nickel Mining, Precious Metal, Vanadium Mining  

Seafield Resources Ltd. reports that a drill was recently mobilized to the Seafield Fire property, optioned earlier this year from Noront Resources Ltd. and is testing the first of several geophysical anomalies located by the earlier airborne survey. The property is located in the “Ring of Fire”, McFauld’s Lake area, Ontario, some 60 km north of Noront’s Eagle One high grade... 

Tombstone Exploration Corporation’s Core From Drill Hole #1 and First 120′ of Drill Hole #2 Being Assayed

August 5, 2008 Filed Under: Diamond Mining, Lead Mining, Precious Metal  

Tombstone Exploration Corporation today reported that drill hole TEMC 101 was completed at 980′. Recovery remained exceptionally high due to the triple technology, and the RQD rate in most instances was over 75%. Core has been photographed, diamond split and sent for assay to ALS Chemex. Drill hole TEMC 102 is under way and is currently at 300′. TEMC 102 is designed to intercept the Santa... 

Delta Uranium to Restructure Its Non-Uranium Assets

July 29, 2008 Filed Under: Diamond Mining, Uranium Mining  

Delta Uranium Inc. announces that subject to regulatory approval, it intends to restructure its holdings whereby the Company intends to divest itself of its non-uranium assets. The proposed restructuring will allow the Company to focus on advancing exploration of its Kenora and Timmins uranium projects as well as to develop other uranium opportunities, which may be of interest. Pursuant to the proposed... 

Nuinsco Begins Uranium Exploration, Schedules Drilling at Prairie Lake

Nuinsco Resources Limited announced that it has begun a uranium exploration program at its 100% owned Prairie Lake property in northwestern Ontario. Prairie Lake hosts a near-surface historic (non-NI-43-101-compliant) resource of over 180,000 tonnes grading 0.09% U3O8 reported by Nuinsco in the 1970s. Surface exploration has begun and samples have been collected in preparation for a minimum 1,500 metre...