New Pilot Hole SHE-118 Extends Mineralization at Kianna Deposit Intersecting 8.6 metres of 5.62% U(3)O8 - Drilling To Resume in September 2006
August 15th, 2006… in the Athabasca Basin, including the producing McClean Lake Deposits operated by AREVA, the producing McArthur River Deposit operated by Cameco Corporation (”Cameco”), and the Cigar Lake Deposit, which is scheduled for production in 2007. About …