Technical Report SEC copper mining

Results 1 - 10 of about 50 news for the search terms: Technical Report SEC copper mining.

Mercator Minerals Commences Producing Copper-Moly Concentrates at Its Mineral Park Mine

December 2nd, 2008

…  than two years from completion of its December 29, 2006 Technical Report. “In less than two years from completion of pre feasibility, Mercator …

Caldera Announces Closing of CanBiomine Resources Acquisition and Debt Settlement

November 3rd, 2008

…  press release dated October 14, 2008 and Material Change Report dated October 15, 2008). About Caldera Caldera is engaged in …  Corporation (CDNX:BM.V) whereby BacTech will provide technical support and know-how on projects sourced by CanBiomine in certain …

Capella Announces Results on Labrador Copper-Nickel-Cobalt Exploration

October 29th, 2008

…  several weaker ones. Copper values up to 0.47% have been reported. The presence of magnetite in mineralized zones has good correlation …  defined by National Instrument 43-101 and has reviewed the technical information reported in this news release for accuracy. The …

Anaconda Announces Additional High-Grade Drill Results and New Molybdenum Results From the Inca de Oro Sur Joint Venture

October 27th, 2008

…  g/t Au and 0.37% Cu, respectively. The principal intersections of Mo are: - 143 m (from 163 m to 306 m) with 831 ppm of Mo in hole …  Control and Qualified Person The drill holes reported in this release were collared using HQWL (2.5″ sized core). Core is …  with respect to Inca de Oro Sur is contained in a technical report dated March 28, 2006, filed on SEDAR and entitled “Carmen …

Nevoro Inc.: Drilling Begins on the Golden Loon Nickel, Cobalt, PGE, Gold Property

October 16th, 2008

…  under National Instrument 43-101 responsible for all technical data reported in this news release is Mr. David Jenkins, former president and CEO of …

Happy Creek Provides an Update on the Company

October 14th, 2008

…  Valley copper concentrator, where in their published second quarter report of 2008, they report mining an average grade of 0.31% copper. On the …  and is responsible for the preparation and approval of the technical information disclosed in the news …

Thunder Mountain Gold Announces an Intercept of Sulfide Mineralization at Their South Mountain Property

October 6th, 2008

…  workings. We are guardedly optimistic that after the assay reports are analyzed the results could enhance the resource defined by previous …  optimistic that the resources outlined in the Kleinfelder technical report can be expanded well below the 150-foot depth cut off below …

Nevoro Inc. Options 50% Interest in Golden Loon Project to Black Panther Mining Corp.

October 1st, 2008

…  under National Instrument 43-101 responsible for all technical data reported in this news release is Mr. David Jenkins, former president and CEO of …

Blue Note Drilling Confirms Continuity of Mineralization at Depth in Caribou Mine

September 22nd, 2008

…  Note Mining Inc. reports its recent underground exploration drilling at its Caribou mine near …  delineated additional resources. The best hole intersecting Lens 3 returned 9.23% Zn, 3.75% Pb and 98.75 gpt Ag over 3.26 meters …  mineralization except two holes that were abandoned due to technical problems. Three of these holes intersected mineralization outside the …

Aquiline Drilling at Navidad Expands New Valle Esperanza Discovery

September 18th, 2008

…  Resources Inc. report on the results of 72 new diamond drill holes (NV08-731 to NV08-802) …  Plata which was recommended by Snowden Mining Group in its Technical Report of November 2007. This will allow for the conversion of most …  as follows: Loma de La Plata (45); Valle Esperanza (14); Sector Z (3); exploration drilling in Valle La Plata (see map for location) …


Incoming Search Terms: